In April 2017, ENGIE achieved commercial operations of the 64.5 MWp Solaire Holman project located in Brewster County, TX. The project consists of a 64.5 MWp solar electric generating facility using poly-silicon technology and single axis trackers to generate electricity for the ERCOT wholesale electric system. The array is selling 100% of its output under a 20-year PPA to the City of Houston, TX.
Leave a Comment